Delta took on this $1.5 million job in the spring of 2001 in Boulder Colorado. The job consisted of some challenging exterior framing and sheathing along with extensive interior work and an 86 ft. high atrium that was framed, rocked and finished all on a large scffold supplied by Safeway Steel Products, Inc. This job was quite a challenge to our crew, but through hard work and determination we are proud to have been a part of it.